Summary:
Behari Lal Engineering IPO closed with 108.44x subscription, led by QIBs at 165.33x and NIIs at 165.31x. Retail investors subscribed 53.27x, showing strong demand across categories. The ₹301.62 crore IPO is expected to be allotted on August 17 and listed on August 19, 2026.
Behari Lal Engineering IPO closed its three-day bidding window on August 14, 2026, wrapping up with an overall subscription of 108.44 times. The ₹301.62 crore mainboard issue, priced at ₹271–₹285 per share, saw demand build steadily through the week, culminating in a strong Day 3 rush led by institutional investors.
Behari Lal Engineering IPO - Day 3 Subscription Status
As of the close of bidding on August 14, 2026, the issue received bids for 8,03,82,824 shares against 74,12,769 shares on offer, taking the overall subscription to 108.44 times. Qualified Institutional Buyers drove the bulk of the demand, subscribing 165.33 times, while Non-Institutional Investors were close behind at 165.31 times. Retail Individual Investors subscribed 53.27 times.
Category-wise Breakdown on Day 3
| Category | Shares Offered/Reserved | Shares Bid For | Subscription (x) |
| Qualified Institutional Buyers (QIBs) | 20,36,900 | 33,67,52,156* | 165.33 |
| Non-Institutional Investors | 16,12,761 | 26,66,13,412* | 165.31 |
| Retail Individual Investors (RIIs) | 37,63,108 | 20,04,62,756 | 53.27 |
| Total | 74,12,769 | 80,38,28,324 | 108.44 |
What Day 3 Numbers Indicate
The sharp jump in QIB subscription — from largely muted activity in the first two days to 165.33 times by close — is typical of mainboard IPOs, where institutional investors place the bulk of their bids on the final day after gauging retail and NII sentiment. The strong NII participation, particularly in the ₹2–10 lakh bid category at 176.45 times, points to healthy demand from smaller HNIs alongside larger corporate applicants. Retail subscription at 53.27 times, while more modest by comparison, still reflects solid individual investor interest, with the bulk of retail bids coming in at cut-off price.
Behari Lal Engineering IPO Subscription Status – Day 3 & Day 2
| Day | Date | Subscription (x) |
| Day 1 | August 12, 2026 | 2.03x |
| Day 2 | August 13, 2026 | 7.78x |
| Day 3 (Final) | August 14, 2026 | 108.44x |
Behari Lal Engineering IPO - Allotment and Listing Date
The basis of allotment for Behari Lal Engineering IPO is expected to be finalised on August 17, 2026. Shares are likely to be credited to demat accounts, and refunds initiated, around the same time, with listing on the BSE and NSE tentatively scheduled for August 19, 2026.
Should You Apply for Behari Lal Engineering IPO?
Behari Lal Engineering is one of India's largest metal rolls producers, meeting an estimated 10–11.5% of the country's demand in FY26, according to CRISIL. The company runs an integrated manufacturing setup across two facilities in Punjab, serves over 1,800 customers across 21 countries, and derives nearly 85% of FY26 revenue from repeat customers. Its product mix has increasingly shifted toward higher-value offerings — engineering castings, metal rolls, and speciality alloy steel grades — which rose to 57.78% of revenue in FY26 from 45.45% in FY25.
Investors considering the issue should weigh the company's steady financial growth and established position in a niche, specialised segment of the steel industry against sector-specific risks such as raw material price volatility and cyclicality tied to end-user industries like automobiles, infrastructure, and mining. As with any IPO, the decision should be based on individual risk appetite, investment horizon, and a review of the RHP rather than subscription numbers alone.
How to Apply for Behari Lal Engineering IPO
Investors can apply for the Behari Lal Engineering IPO through ASBA via their bank's net banking portal, via UPI-based ASBA through their stock broker's trading app, or offline by submitting a physical ASBA form through their broker. The minimum lot size is 52 shares, requiring a minimum investment of approximately ₹14,820 at the upper price band.
Behari Lal Engineering IPO Important Dates
| Event | Date |
| IPO Open Date | August 12, 2026 |
| IPO Close Date | August 14, 2026 |
| Allotment Finalisation | August 17, 2026 |
| Refund Initiation | August 17, 2026 |
| Demat Credit | August 17, 2026 |
| Listing Date | August 19, 2026 |
| Listing Exchanges | BSE, NSE |
Day 2 & Day 3 Subscription Updates
Subscription momentum accelerated sharply between Day 2 and Day 3. On Day 2 (August 13), the issue stood at 7.78 times overall, with bids for 5.76 crore shares against 74.12 lakh shares on offer. By the close of Day 3, total bids had grown to over 8.03 crore shares, pushing the overall subscription to 108.44 times — a jump driven almost entirely by institutional and NII bidding in the final hours.
How to Check Behari Lal Engineering IPO Subscription Status
How to check Behari Lal Engineering IPO Subscription Status on NSE website
- Visit the NSE IPO issue information page (nseindia.com).
- Search for "Behari Lal Engineering" or enter the symbol BLEL.
- Select "Consolidated Bid Details" from the dropdown to view category-wise subscription data.
- The page refreshes periodically to show live bidding figures during market hours.
How to check Behari Lal Engineering IPO Subscription Status on BSE website
- Visit the BSE IPO page (bseindia.com).
- Navigate to the "Active IPO" or "IPO Bidding" section.
- Select "Behari Lal Engineering Limited" from the list of active issues.
- View category-wise and overall subscription figures, updated through the bidding window.
How to check Behari Lal Engineering IPO Subscription Status on Ventura?
Ventura clients can track real-time subscription status for the Behari Lal Engineering IPO directly within the IPO section of the Ventura app or web platform, alongside category-wise bid data, and allotment updates — without needing to switch between exchange websites.
IPO Subscription History
Previous Day Subscription
The issue opened modestly on Day 1 with 2.03 times overall subscription, reflecting the typical early-week pattern where retail and NII bidding builds gradually. Day 2 saw subscription rise to 7.78 times as broader investor participation picked up ahead of the closing day.
Final Subscription Figures
The Behari Lal Engineering IPO closed with a final overall subscription of 108.44 times, with QIBs (165.33x) and NIIs (165.31x) leading demand, followed by retail investors at 53.27 times.
Conclusion
Behari Lal Engineering's IPO closed on a strong note, with overall subscription crossing 108 times on the back of heavy institutional and NII interest in the final bidding session. With allotment due on August 17 and listing scheduled for August 19, 2026, investors who applied will need to check their allotment status closer to those dates through the registrar, exchange websites, or their broking platform.









